Plum Creek Village PlanMontgomery
County,
2025
Adopted: 25 June 2007
Plum Creek
Village Plan
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 274
Introduction
The purpose of the village plans is to guide
development in each of the villages, while
maintaining each villages distinct identity. The
village planning process provides citizens in
each of the seven villages (six plans) with a say
in how their respective villages develop over
the next twenty years. This additional input is
important because of the County’s focused
growth approach, which will focus 80% of the
County’s growth between now and 2025 into
the villages, village expansion areas, residential
transition areas, and the urban expansion areas.
Under the guidelines established in
Montgomery County, 2025, villages are defined
as “ larger rural communities where limited
mixed-use development activity has historically
occurred and public utilities are available;...are
separate and distinct from each other and from
nearby towns;... and have served as and will
continue to serve as focal points for surrounding
rural areas.” The village expansion area, on the
other hand, is defined as the areas “adjacent to
existing villages where appropriate new
development can be accommodated while
retaining the viability and character of the historic
village core. It is assumed that the villages and
village expansion areas are either currently
served by public water and sewer and other
public facilities (schools, parks, or fire and rescue
stations) or where public water and sewer is
likely to be provided in the future.
Planning Process and Community Input
Results
The Plum Creek Village Plan was developed
through the combined efforts of citizens, Virginia
Tech students and faculty, and staff from the
Montgomery County Department of Planning
and GIS Services.
The public input process for the Plum Creek
Village Plan can be divided into three phases:
a door-to-door household survey, two community
visioning sessions, and finally, review by the
Montgomery County Planning Commission and
the Montgomery County Board of Supervisors
and adoption.
Household survey
On February 28, 2007, students from Virginia
Tech conducted a door-to-door survey of all
households in Plum Creek. Residents said they
enjoy the rural setting, and the quiet and
neighborly atmosphere. They also like the
convenience to neighboring communities such
as Radford and Christiansburg, and services,
such as the trash facility, hospital and stores.
When asked what changes they would like
to see in the future, the residents noted:
• Road improvements, especially the
intersection of Rock Road and Route 11
• Removal of trash and litter along
roadways
• Better home and property maintenance,
along with zoning enforcement
• Enhanced traffic enforcement and police
presence
• Improved public services, e.g., water
quality, animal control, trash pickup, park
• More village-scale business opportunities.
Community visioning sessions.
During February and March of 2007, the
county hosted two community meetings for the
Citizens Advisory Committee. These meetings
were well attended by concerned local citizens
of Plum Creek and those with an interest in the
future development of Plum Creek.
At the first meeting, held on February 27th,
residents and interested local citizens identified
their concerns for the village and defined their
preferred future for Plum Creek. At that meeting,
the participants identified the following areas
of interest:
• Transportation: increase pedestrian safety
with sidewalks, reduce speed limit and
add signage, improve the intersection of
Rt. 11 & Rock Road (T intersection),
The Village of Plum Creek
Photo by Planning Staff
Photo by Planning Staff
Public hearings, plan review and plan adoption.
adoption of the plan. The Board of Supervisors
Historical Development Patterns
Current Conditions and Trends
Population
According to the 2000 Census, the
approximate population of Plum Creek was
1,803. Of those residents, 97% were White, 2%
were African American, and the remaining 1%
were American Indian, Asian, and Pacific
Islander. Hispanics or Latinos made up 1% of
the population.
The population of Plum Creek is almost
evenly divided in terms of gender: 50.4% of the
population is female; 49.6% is male. The
difference is slightly more pronounced in
residents 65 years and older (54% female, 46%
male) and those under the age of 18 (49% female,
51% male).
Slightly more than a quarter of the Plum
Creek population (26.4%) is 17 or younger, a
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 275
The Montgomery County Planning
Commission a public hearing for the Plum
Creek Village Plan on May 9, 2007, at the
County Government Center and recommended
held a public hearing on May 29, 2007 and
adopted the Montgomery County 2025: Plum
Creek Village Plan on June 11, 2007
concern about bike lane off Rt. 11, reduce
traffic & noise concerns, problems with
ditching along the side of the road,
improve road maintenance, link all parks
and walking trails.
• Appearance: focus on beautification,
improve appearance of car lots, desire
small businesses, cleanup current
properties, encourage landscaping,
incentives to cleanup abandoned
buildings, zoning overlay to increase
maintenance of properties; problems with
trash in yards and being left out, create
community trash day?
• Schools: Montgomery County requires
16 acres - is there enough land? The
school might help develop sense of
community, currently busing kids to
Riner, why did the old school close
down?
• Affordable Housing: good to allow
affordable housing because there is not
much in the county.
• Recreation/Parks: need more recreation
opportunities, keep kids occupied, keep
Texas Road Park as a community asset.
• Montgomery County Sheriff: not seen
often, would like to have increased police
presence, especially around the Texas
Road Park.
• Animal Control: need to create or enforce
the Leash law to decrease the problem
with dogs, control cat population.
• Stormwater Management: difficult with
steep slopes and small creek, clean up
abandoned buildings and other
commercial development in the
floodway.
During the second meeting on March 31st,
participants reviewed results from the first
workshop; and evaluated and affirmed the vision
statement, goals and strategies, as well as the
future land use map.
Plum Creek derives its name from a small
creek that runs through its boundaries and
empties into the New River. U.S. Route 11 has
always served as the focal point for development
in the Plum Creek Village; and until Interstate
81 was extended through southwest Virginia in
1965, U.S. Route 11 was the primary highway
for the entire Montgomery County/Radford
area. By the 1930s, the Route 11 corridor in
Plum Creek had become a tight knit community
of small houses and local businesses. This
included restaurants, bars, and a general store.
Change was inevitable, and over time, Plum
Creek has gained and lost community
businesses. Car dealerships have become
significant elements in the local landscape. A
small one room school house on Walton Road
was replaced by Bethel Elementary in 1954.
Trailer homes were also being developed in
Plum Creek at this time, providing affordable
housing opportunities for residents.
Many of these characteristics of Plum Creek
remain today. The Village is predominantly rural
in character, with several important commercial
establishments located along the Route 11
corridor.
Photo by Planning Staff
Photo by Planning Staff
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 276
code requirements which limit the amount of
investment for properties located in a floodway,
much of the commercial district is badly
deteriorated and will eventually need to be
the narrowness of the Plum Creek valley, a large
percentage of the existing structures in that
stretch of Rt. 11 are in the floodway portion of
the floodplain and under state rules can not be
redeveloped or rehabilitated.
Plum Creek also contains a large portion of
shrink-swell soils, soils which expand and
contract with moisture, making for less favorable
conditions for building foundations. In addition,
only small areas of Plum Creek are suitable for
septic systems, which means than any new
development, regardless of density, will need
to be served by public sewer.
According to longtime residents, the
groundwater quality in Plum Creek is abysmal.
Because of the low water quality, due to the
presence of sulphur and other minerals, Plum
Creek is served by the PSA, which supplies
residents with water from the City of Radford
public water system. Any future development,
regardless of density, will need to be served by
public water.
Existing Land Use
According to participants in the community
survey and in the community meetings, Plum
Creek has long been known for used car lots
and beer joints, land uses which are still much
in evidence and contribute to the “air of neglect.”
The majority of Plum Creek is residential,
although there is a significant commercial area
along the Rt. 11 corridor. While Plum Creek has
existed as a community since the construction
of Rt 11 in the early 1930s, the majority of Plum
Creek is relatively new. The 1990s saw the rapid
expansion of the residential areas, primarily due
to Parkview and subsequent subdivisions by Jim
Lucas and Community Housing Partners.
As is noted elsewhere, much of the
commercial district is located within the 100
year flood zone of Plum Creek. Because of state
at risk in the past. Nearly the entire length of
the Rt 11 corridor between the Plum Creek
Restaurant to the east and the Rt 11/Rock Road
intersection is in the 100 year floodplain. Given
number that is much higher than Montgomery
County as a whole (15.9%). The percentage of
the Plum Creek population that is 65 and older
(9.2%) matches the percentage of the overall
population in the county (9.1%).
Natural Environment
Plum Creek is located in the foothills
adjacent to the New River and is defined by
three environmental features: steep slopes, Plum
Creek, and the Plum Creek floodplain. High
intensity development on the slopes above the
Plum Creek valley have exacerbated the flood
problem by contributing greater runoff than
occurred in the predevelopment era. This
increased runoff means that properties along
Rt. 11, which parallels Plum Creek on the north,
are now at risk of flooding when they were not
removed.
Housing
According to the 2000 Census, their are 702
households in Plum Creek. Of those households,
509 (72.5%) are occupied by families (2 or
more people related by blood, marriage, or
adoption); 145 (20.6%) have single occupants,
and the remaining 48 households (6.6%) have
two or more unrelated adults, but no children.
Of households with children, 76 are headed by
single parents (3.4% with single fathers and
7.4% with single mothers).
The average household size is 2.5 occupants,
and the average family size is slightly higher at
2.8 persons per household.
There are 746 housing units in Plum Creek.
Of these, 702 are occupied (94.1%) and 42 are
vacant (5.9%). The vacancy rate in Plum Creek
is only slightly higher than Montgomery County
as a whole (4.7%). Of the occupied units, 577
(82.2%) are owner occupied and 125 (17.8%)
are occupied by renters.
Photo by Planning Staff
Photo by Planning Staff
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007
Transportation
The main roads in Plum Creek are East Main
St., which turns into Radford Rd., (Rt.11) and
Rock Road (Rt. 688). Rt. 11 is the major road
Photo by Planning Staff
in Plum Creek, running from the North Western
area to the Eastern side of Plum Creek.
According to the 2005 Virginia Department
of Transportation (VDOT) report of Average
Daily Traffic Volumes with Vehicle
Classification Data on Interstate, Arterial, and
Primary Routes, the annual average daily traffic
on East Main St./Radford Rd. (Rt.11) is 8,300
vehicles per day.
Public Facilities and Services
The Montgomery County Public Service
Authority provides both water and sewer to
Plum Creek. The public water is supplied
through an agreement with the City of Radford.
While sewer capacity is not an issue in terms
of treatment, there are limitations, currently, on
the number of households that can be served
because of limited pump station capacity.
Montgomery County currently has two
public parks in Plum Creek: Texas Road Park
and Hornsby Park. The Montgomery County
Parks and Recreation Department is currently
considering closing Texas Road Park because
of vandalism problems. The park is located in
a remote area of Plum Creek and is accessed
by a private street. In addition, Texas Road is
frequently flooded during inclement weather.
Because of these factors, the Montgomery
County Sheriff’s Department does not routinely
patrol Texas Road Park. The Hornsby Park,
adjacent to the Plum Creek Solid Waste
Collection Facility, is relatively new and
provides residents with access to a new
playground facility and a ballfield.
Fire and rescue service in Plum Creek are
provided by Christiansburg Fire and Rescue.
Both stations are well beyond the 5 minute
response distance.
Until a few years ago, students from Plum
Creek attended Belview Elementary School,
and then commuted by bus to either Riner or
Christiansburg, Currently students, including
those attending elementary school, residing on
the east side of Plum Creek (Gallimore Street
and east) attend schools in Christiansburg,
while students from Blair Street and west attend
school in the Auburn strand.
Community Organizations
Plum Creek residents are active in church
and school organizations. Roughly 23% are
involved in a church organization and 12% are
Photo by Planning Staff
Photo by Planning Staff
involved with a school organization. Only 2%
are active in either civic organizations or a
homeowner's association.
Planning Assumptions and Land Use
During the village planning process,
participants relied on five key planning
assumptions:
• Population growth will continue during
the next 25 years, in general accord
with the County’s Comprehensive Plan.
(At slightly more than 1% average
annual growth; up to about 25,000 more
people in the County as a whole by
2030, with 6,000- 8,000 in the
unincorporated areas and the remainder
in the two towns;
• Residential development will be
concentrated mainly in the County’s
designated growth areas, including the
Urban Expansion Areas, the Residential
Transition Areas, and the seven Villages
and six Village Expansion Areas;
• Residential development densities in
the Plum Creek area will occur in
general accord with the County’s
Comprehensive Plan, with 2 units per
gross acre;
Plum Creek Village Land Use Summary
Overall Assumptions for Total Expansion Area: 1009 acres, approx.; Current Infrastructure Capacity: TBD.. (1); Projected Gross Density:
2 du/ac. approx.
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 278
Assumptions:
1) At full buildout, which is beyond the horizon of this plan, Plum Creek will have no more than 1600 dwelling units. At current rate of
growth, Plum Creek is not expected to reach full buildout without significant redevelopment within the existing core and expansion
of the current public water and sewer systems. According to the Public Service Authority, expansion of the sewer system will require
an upgrade in the current pump station and, potentially, restructured agreements with the City of Radford.
2)Currently, existing residential neighborhoods are either medium or high density. The low density residential areas are meant to provide
additional single-family opportunities within the village of Plum Creek.
3) Medium and low density areas are concentrated on the east side of Plum Creek,
while the high density is located along Rock Road on the western end of the village.
Concentrating higher density development on Rock Road follows the existing
development patterns for the western end of the village and is located where higher
levels of traffic can be more easily dispersed to both the 177 corridor and to Rt.
11.
4)Mixed use areas are likely to be a combination of light industrial and commercial,
rather than the residential/commercial combination found in the other villages..
Any future industrial and commercial development should occur well above the
flood elevation levels which define much of the current commercial area of Plum
Creek. Because of restrictions on property maintenance and redevelopment within
the floodway for a 100 year flood zone, many of the existing commercial enterprises
will need to be moved to less flood prone areas and the lands within the floodway
will be taken out of commercial use.
Settlement Existing New Max. Dwelling Density
Types Acreage Dwelling Units Dwelling Units Units @ Buildout Range
Low Density Residential 198 35 165 200 0-2 du/acre
Medium Density Residential 503 440 225 665 2-4 du/acre
High Density Residential 192 235 500 735 4+ du/acre
Mixed Use 116 28 0 0 2-4 du/acre
Total 1009 740 890 1600 2 du/acre
Photo by Planning Staff
much of the development in the future will
come from redeveloping existing lands to higher
densities.
Neighborhood Types and Land Uses
Mixed Use Development
Mixed use development has been the rule
rather than the exception in the majority of the
Villages in Montgomery County. Part of this
is due to the nature of small, contained, and
constrained spaces. Unlike their larger
counterparts, which have the luxury of land
and expansive public works and may more
clearly separate uses, villages and village
expansion areas are constrained by limited
public facilities, especially the possible extent
and capacity of public water and sewer. Given
the limitations, all of the land use designations
are based on the assumption of mixed use
development.
Mixed use development means that while
certain uses may be deemed most appropriate
for a specific area of the village, the primary
use designation does not preclude other types
of development in, near, or in lieu of the primary
designation. In a sense, this approach means
that portions of the villages and village
expansion areas are treated, in essence, as large
planned unit developments. Indeed, the mixed
use approach to village development encourages
the creation and strengthening of the sense of
community with the village by making goods,
services, and jobs more readily available and
accessible to residents. The approach also
assumes that future development, rather than
destroying or overpowering the historic core,
will be designed to strengthen the historic
development patterns, add to the quality of life
of residents, and provide appropriate levels
and scale of development.
Residential Neighborhoods
The Montgomery County 2025: Plum
Creek Village Plan designates
three residential neighborhood types: Low,
Medium, and High Density. The designations
do not mean that there will be two, three, four,
or more dwelling units on every acre of land,
but they do provide a guide to the number of
dwelling units, overall, that can be developed
on a specific parcel (gross acreage). The
designations were used to match the village plan
to the existing ordinance. Residential
development in the low density neighborhoods
is intended to be stick-built or modular single-
family housing. The Medium Density
neighborhoods may include a wider variety of
housing types, including: single-family
dwellings, accessory dwellings, duplexes,
triplexes, and quadplexes as infill. Currently,
high density residential is defined primarily as
manufactured housing parks, but may also
include larger scale multi-family developments
and redevelopments. As with the Medium
Density neighborhoods, the Mixed Use
neighborhoods are appropriate locations for a
wider variety of housing types, including
residential and commercial uses within the same
structure or development.
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 279
277
• Small amounts of job growth will occur
in the immediate vicinity of Plum Creek
mainly village-scale businesses and
telecommuting jobs; and
• Public water and sewer service will be
limited to those areas designated in the
Montgomery County 2025: Plum Creek
Village Plan.
There are a number of assumptions specific to
Plum Creek that contributed to the overall future
land use scheme. Most notably, the Plum Creek
floodplain and the steep slopes in the village
severely limit the amount of redevelopment
along Rt. 11. and new development above Rt.
11 and Rock Road. Special attention will need
to be paid to the impact of any new development
on stormwater runoff and floodplain levels so
as not to exacerbate the existing conditions.
Plum Creek is likely to continue to grow because
of its close proximity to the 177 Corridor and
the City of Radford. While there are areas where
the slope will allow some new development,
Photo by Planning Staff
Photo by Planning Staff
The following statement of the preferred future of Plum Creek was
created by the citizens at the first meeting and evaluated and refined
at the second meeting. This Vision Statement essentially summarizes
the key goals for the future of the village.
In the Year 2030, Plum Creek:
Plum Creek is the kind of place people can be proud of. Over the
last 25 years, residents and property owners have worked diligently to
make Plum Creek a "real" village with beautiful streets, community
parks, and a network of walking and bicycling trails.
U.S. Route 11 still runs through the village, but it doesn't seem like
such a huge thoroughfare any more, at least not since they reduced the
maximum speed limit and created a T intersection at Rock Road. The
improvement program included the creation of village gateways, with
"Welcome to Plum Creek" signs, median landscaping, crosswalks and
other elements. Parents know their children will be safe as they travel
to and from school or Hornsby Park.
Flooding used to be a problem, but that, too has disappeared. Many
years ago now, Plum Creek and the County collaborated on a stormwater
management plan that has really changed the character of the village
core. The former business district has been moved farther west, closer
to Radford. In its place is a beautifully landscaped linear park that
holds runoff during large storms. Most of the time, though, the park
is known for its walking and bicycling trails, one of many recreation
resources available to Plum Creek residents.
Plum Creek now boasts its own school. The school is located very
near to Hornsby Park, which means school children can take advantage
of the recreation fields there, both during the day and after school. The
school and the park are really the heart of Plum Creek and are used
almost non-stop by individuals, families, and community groups. In
fact, Hornsby Park had to be expanded a number of years ago, just to
accommodate resident and school needs. And, with so many people
in the park, problems of vandalism have disappeared, and the few
instances they do have are repaired by the County almost immediately.
Because of its location to Radford, Blacksburg and Christiansburg,
Plum Creek has become an attractive place to live. Additional housing
development is carefully sited to protect floodplains and other natural
resources, and the density of new development very much reflects the
kinds of residential development Plum Creek has known for decades.
This includes mobile homes, though the parks are now required to
install landscaping and provide pocket parks, tot lots or recreation
facilities or at least to incorporate trails to connect mobile home
residents to parks elsewhere in Plum Creek.
New business development has been limited to small, family-owned
establishments. Plum Creek has resisted development by franchises
and "big box" retail, preferring a shopping experience that is unique to
the village core.
The community has developed a strong working relationship with
the County and is actively engaged with elected officials and staff in
decisions related to community goals, needs and opportunities. One
of the best examples of this is the transportation plan for the U.S. Route
11 corridor: residents worked with the County and VDOT to create an
acceptable corridor design and incorporate the traffic calming and
pedestrian safety measures that are so important to the community
today.
Plum Creek Village Plan: Statement of Preferred Future
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 282
Photo by Planning Staff
The following policies were developed in meetings with village citizens.
These policies are to guide the actions of the County, State Agencies,
and private landowners to achieve the preservation and development of
Plum Creek in accord with the Vision of this Plan.
PCV 1.0 Land Use Policies
PCV 1.1 General Policies
PCV 1.1.1 Overall Gross Density for the Village
Planning Area. The overall density of the village planning
area should never exceed two (2) dwellings per gross acre
at full build-out (expected to occur beyond the horizon of
this plan).
PCV 1.1.2 Compatibility is Fundamental. The density,
type and character of new development must be compatible
with the existing village, the vision of the village’s future,
and be generally consistent with the Land Use Plan Map.
New development must be compatible with the traditional
forms and architectural character of the village.
PCV 1.1.3 Guidelines Are Firm But Flexible. The
policies of this plan are firm guidelines for the County
and for developers. While there is flexibility in how to
achieve these policies, all new development should follow
them in spirit and in action.
PCV 1.1.4 A Variety of Housing Types Should be Built.
The County will encourage a variety of housing types,
costs and net densities, in order to provide high quality
housing for a range of ages and income levels. Most
housing will be single-family detached units, but may
include accessory units, small single-family detached
dwellings, apartments on the second floor levels of
employment or civic buildings, and housing for elderly
citizens.
PCV 1.1.5 Village Gateways. Establish Clear Gateways
at the Major Road Entrances to the Village. Landscaping,
signage, grading and pavement design should be used to
create a sense of transition into the village on Radford
Road from the east and west. These gateways should be
understated, with a traditional, rural village character, with
street design, landscaping and architecture that will naturally
slow traffic as it approaches the village.
PCV 1.1.6 Proffers Are Expected to Mitigate Impacts.
Any rezoning to a higher intensity of land use, particularly
residential land uses, will be expected to provide proffers
of land, infrastructure and/or funding to off set the impacts
of the development, particularly on capital facilities such
as roads, parks, schools and public safety.
PCV 1.1.7 Incorporate Universal Design Features. A
portion of dwelling units within any given residential
project should feature "universal design" in order to provide
for all age groups and to allow people to "age in place"
within the village.
PCV 1.2 Future Land Use Map. Achieve the Vision for future
development as defined in the Future Land Use Map
PCV 1.3 Rural Character. Maintain the rural character of the
Village of Plum Creek.
PCV 1.3.1 Traditional Neighborhood Design. Use
innovative neighborhood best practices, including
traditional neighborhood design, planned unit development
approaches, or clustering techniques to strengthen the
sense of community within Plum Creek while maintaining
the rural character of the area surrounding Plum Creek.
PCV 1.3.2 Commercial Development. New commercial
development should be at a scale that is appropriate for
the rural community character of Plum Creek. Village-
scale commercial development provide opportunities for
locally owned businesses. Commercial developments
should not be in the form of "strip malls." Mixed use
development should focus on a combination of live-work,
commercial/residential units, professional offices, and
single commercial units.
PCV 1.3.3 Impact on Significant Environmental
Features. To the maximum extent possible, new
Plum Creek Village Plan: Policies
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 283
development should minimize the impact on flood plains,
ridgelines, tree canopies, scenic views, steep slopes, and
stormwater runoff.
PCV 1.4 Community Identity. Protect and enhance the variety
of resources that give Plum Creek its special character.
PCV 1.4.1 Regulatory Changes. Adopt zoning district
language, development regulation, design guidelines, or
other tools to enable development that is compatible with
the existing scale and character of Plum Creek, which
includes:
(a) residential clustering and open space
requirements;
(b) village commercial rather than regional, large-
scale or big box development; and
(c) density bonuses for meeting or exceeding open
space conservation, affordable housing, or other
goals.
PCV 1.4.2 Use landscaping, signage, grading, pedestrian
islands, median strips and street design to establish village
gateways and create a sense of place in Plum Creek
PCV 1.4.3 Move the Plum Creek welcome sign near the
Plum Creek Restaurant (Monks).
PCV 1.5 Revitalization and Property Maintenance. Improve
the general appearance and aesthetic character of Plum Creek.
PCV 1.5.1 Rt. 11 Corridor. Install street trees and
landscaping to improve the overall appearance of the U.S.
Route 11 corridor, and as a strategy for increasing
absorption of stormwater.
PCV 1.5.2 Maintenance and Revitalization. Encourage
maintenance and/or revitalization of existing properties;
and reuse of properties where revitalization is either not
possible, financially prohibitive, or prohibited under State
and Federal floodplain regulations.
PCV 1.5.3 Property Maintenance Codes: Manufactured
Housing Developments. Create and enforce age, property
maintenance, and community facility codes for
manufactured housing developments.
PCV 1.5.4 Property Maintenance Codes: Commercial
Properties. Create and enforce property maintenance
codes, including a junk code, for commercial areas,
including landscaping and fencing regulations.
PCV 1.5.5 Dilapidated Structures. Identify dilapidated
buildings and work with property owners to either
rehabilitate or redevelop these properties or relocate the
existing use.
PCV 1.5.6 Structures in Floodplains. Provide Plum
Creek Village with the proper resources to tear down
dilapidated buildings located in the floodplain
PCV 1.5.7 Public Information. Provide public
information on property maintenance, rehabilitation, and
relocation grants and programs from state and federal
agencies.
PCV 1.5.8 Historic Structures. Identify locally significant
structures and work with owners, as appropriate, to achieve
historic designation and listing on the state and federal
registers.
PCV 1.5.9 Sense of Place. Use design elements such as
medians, sidewalks and gateway signs and streetscaping
to complement the slower speeds and instill the impression
of "place" in Plum Creek.
PCV 1.6 Low Density Residential Neighborhoods: Land Use
and Urban Design
PCV 1.6.1 Density. Density in Low Density Residential
Neighborhoods should not exceed two (2) dwelling units
per gross acre.
PCV 1.6.2 Uses. Land uses in Low Density Residential
Neighborhoods should be limited to single-family dwelling,
secondary accessory dwellings, and home occupations.
PCV 1.5.3 Infill Development. Infill development should
complement and be consistent with existing neighborhood
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 284
development styles and patterns.
PCV 1.6.4 New Development. New development should
complement and be consistent with existing neighborhood
development styles and patterns; should have a street
pattern and pedestrian facilities which interconnect with
the existing transportation system within the village; and
should follow traditional neighborhood design (TND)
guidelines established by the County.
PCV 1.7 Medium Density Resident Neighborhoods: Land Use
and Urban Design
PCV 1.7.1 Density. Density in Medium Density Residential
Neighborhoods should not exceed four (4) dwelling units
per gross acre.
PCV 1.7.2 Uses. Land uses in Medium Density Residential
Neighborhoods should be limited to single-family dwelling,
secondary accessory dwellings, limited multifamily
dwelling units (duplexes, triplexes, and quadplexes) which
fit with the character of the neighborhood, home
occupations, and appropriate home businesses.
PCV 1.7.3 Infill Development. Infill development should
complement and be consistent with existing neighborhood
development styles and patterns.
PCV 1.7.4 Redevelopment. Redevelopment should
complement and be consistent with village-scale
development styles and patterns and should fit within the
existing transportation framework for the village.
PCV 1.7.5 New Development. New development should
complement and be consistent with existing neighborhood
development styles and patterns; should have a street
pattern and pedestrian facilities which interconnect with
the existing transportation system within the village; and
should follow traditional neighborhood design (TND)
guidelines established by the County.
PCV 1.8 High Density
PCV 1.8.1 Density. Density in High Density Residential
Neighborhoods should not exceed eight (8) dwelling units
per gross acre.
PCV 1.8.2 Uses. Land uses in High Density Residential
Neighborhoods should be limited to multifamily and
manufactured housing developments, which fit with the
character of the neighborhood, home occupations, and
appropriate home businesses.
PCV 1.8.3 Infill Development. Infill development should
complement and be consistent with existing neighborhood
development styles and patterns.
PCV 1.8.4 Redevelopment. Redevelopment should
complement and be consistent with village-scale
development styles and patterns.
PCV 1.8.5 New Development. New development should
complement and be consistent with existing neighborhood
development styles and patterns; should have a street
pattern and pedestrian facilities which interconnect with
the existing transportation system within the village; and
should follow traditional neighborhood design (TND)
guidelines established by the County.
PCV 1.9 Mixed Use Neighborhoods
PCV 1.7.1 Encourage Infill Development. Most of
future growth in the mixed use neighborhood area should
be infill and redevelopment of existing sites. Ensure that
new infill development is compatible with the existing
village. Such development should be a small-scale mix
PCV 1.9.2 Encourage Mixed-Uses. Land uses along
Mixed Use Neighborhood should be a mix of residential,
commercial, office and institutional uses. Limit new
commercial and employment uses to village -scale,
individual or stand-alone buildings with small building
footprints that are architecturally compatible with the
existing commercial and institutional uses.
PCV 1.9.3 Live/Work Units. Encourage “live/work”
units, which feature a shop or small-scale office use on
the ground floor and a residential dwelling above or behind
the shop, not more than two stories above the street.
PCV 1.9.4 Floodplain. Discourage development and
redevelopment in floodprone areas.
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 285
PCV 1.9.5 Design Details. The County and the Plum
Creek community will strive to maintain the rural, informal
character of the mixed use village neighborhoods by:
(a) Locating new or expanded parking areas behind or
to the side of the buildings; screening parking
from adjacent uses with landscape buffers and
using alley access where feasible.
(b) Providing a strong pedestrian orientation along
the street frontage, with parking located mainly at
the rear of the buildings
(c) Prohibiting auto-oriented functions like drive-
through windows
(d) Encouraging new buildings to generally match the
setbacks of adjacent buildings while also
maintaining a variety of setbacks and orientations.
(e) Orient building fronts toward main streets, and
service backs of buildings through alleyways,
wherever feasible
(f) Encouraging porches, street trees, street furniture,
sitting areas and other pedestrian-friendly design
elements.
PCV 2.0 Government and Planning
PCV 2.1 Communication. Create the means for effective
communication between Montgomery County and the citizens of
Plum Creek.
PCV 2.1.1 Plum Creek Webpage. Create and maintain
a Village of Plum Creek page on the Montgomery County
website, with data specific to the village and surrounding
community (e.g. statistics on population, schools, income,
and poverty), postings on programs and events, information
about possible grants or other funding opportunities, etc.
PCV 2.1.2 Community Network. Work with Plum Creek
residents to create a community network for communicating
information on new development and other activities in
the Village.
PCV 2.1.3 Print Communication and Notification.
Identify opportunities to use utility or tax bills, etc., to
disseminate flyers, newsletters, or postcards with
community information.
PCV 2.2 Collaboration. Promote collaboration between County
agencies and the village residents they serve.
PCV 2.2.1 Improve Local Relations and Service
Opportunities. Improve local relations and expand service
opportunities with the Montgomery County Sheriff's
Office, the Public Service Authority, and other County
departments and agencies.
PCV 2.2.2 County Outreach and Education. Expand
County outreach and development programs so that
community organizations are included in identifying and
responding to community problems and needs. As part of
this process the County should provide technical and staff
support, funding, and opportunities for collaboration on
program development and operations.
PCV 2.2.3 Neighborhood Watch. Work with the
Montgomery County Sheriff's Office to develop a
neighborhood watch program.
PCV 2.3 Work Closely with VDOT to Achieve the People’s
Vision. The County will work closely VDOT to ensure that the
urban design, mobility and public safety policies of this plan are
implemented. Cooperation between the County, VDOT, and
private developers and landowners will be critical to the success
of this plan.
PCV 2.5 Encourage a Unified Community. The County will
encourage the people of Plum Creek to act as a single, unified
community when working with the County, the Towns, and the
State in implementing this Plan. The County encourages the
citizens to take a leadership role in implementing this Plan once
it is adopted.
PCV 2.5.1 Citizen Advisors. Continue to work with civic
and community groups in Plum Creek on finalizing and
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 286
implementing the Montgomery County 2025: Plum Creek Village Plan.
PCV 3.0 Educational Resources
PCV 3.1 Future Educational Needs. Work with the Montgomery
County Public Schools to address the future educational needs
for children in Plum Creek and Bethel.
PCV 3.1.1 Future School Site. Purchase the 16 acres
required for construction of an elementary school in Plum
Creek, near Hornsby Park if possible, to take advantage
of recreation facilities there.
PCV 4.0 Economic Resources
PCV 4.1 Village Scale Economic Development. Support and
enhance a locally-based economy and job opportunities in Plum
Creek.
PCV 4.1.1 New Business District. Encourage the
relocation and development of a new village mixed use
district along U.S. Route 11 between the Rock Road
intersection and the Radford city limits, outside of the
floodplain.
PCV 4.1.2 Light Manufacturing. Encourage village scale
light manufacturing, which creates local jobs, in the mixed
use district upon rezoning and approval of site design.
PCV 4.1.3 Village Scale Businesses. Recognizing that
commercial and industrial development should be village-
scaled, “big box” stores would not be appropriate in Plum
Creek.
PCV 5.0 Environment Resources
PCV 5.1 Floodplains and Stormwater Management. Minimize
property damage and the impact of stormwater runoff and flooding
on local residents, property owners, and businesses.
PCV 5.1.1 Sustainable Development Approaches.
Promote sustainable development approaches that protect
watersheds and stream corridors, reduce development in
floodplains, enhance water quality, and minimize the
impact of stormwater runoff.
PCV 5.1.2 Impervious Surfaces. Remove or reduce
impervious surfaces in the floodway and 100-year
floodplain to maximize the area available for stormwater
recharge.
PCV 5.1.3 Greenways. Take advantage of development
constraints imposed by floodplain to create a linear park,
bicycle trail, and/or greenway system and connect Plum
Creek residents to local facilities and services.
PCV 5.1.4 Riparian Buffers and Landscaping. Install
street trees and landscaping to improve the overall
appearance of the U.S. Route 11 corridor, and as a strategy
for increasing absorption of stormwater.
PCV 5.2 Stormwater Management Plan. Work with the County
Engineer to develop and implement a village-wide stormwater
management plan.
PCV 6.0 Housing
PCV 6.1 Housing Opportunities. Provide rental and owner-
occupied housing opportunities that are affordable to a wide range
of individuals and families, including seniors.
PCV 6.1.1 Affordable Housing. Adopt regulations or
institute incentives for the creation of affordable home
ownership opportunities, including:
• residential clustering, zipper lots, zero lot line
development, reduced minimum lot sizes, etc.
• construction of townhouses, condominiums,
and accessory residential units
• density bonuses for affordable housing
development
PCV 6.1.2 Homeownership. Investigate opportunities to
transition renters and mobile home owners to
property/home ownership.
PCV 6.1.3 Manufactured Housing Parks. Adopt
development regulations and design guidelines that enhance
the quality and character of mobile home parks, e.g.,
related to landscaping and streetscaping, tot lots and
recreation areas, greenways and paths that connect to
schools and other community facilities).
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 287
PCV 6.1.4 Mixture of Housing Types. Provide a mix of
housing types and housing densities that reflect the
community's vision and the character of Plum Creek.
PCV 6.1.5 Cluster Development. Allow for cluster
development as an approach for accommodating growth
while minimizing the impact on community character,
scenic views, and environmental resources.
PCV 7.0 Community Resources and Services
PCV 7.1 Adequate Community Resources. Ensure that Plum
Creek residents receive the quality services they deserve, including
but not limited to education, public safety, parks and recreation,
social services, and water and sewer.
PCV 7.1.1 Community/Government Relations. Improve
local relations and expand service opportunities with the
Montgomery County Sheriff's Office, the Public Service
Authority, and other County departments and agencies.
PCV 7.2 Community Center. Work with the citizens of Plum
Creek to either redevelop/reuse an existing structure (e.g. “The
Alamo” or another existing commercial structure) or construct
a new structure as a Plum Creek community center.
PCV 8.0 Public Safety.
PCV 8.1 Emergency Services:. Promote and improve public
safety and emergency services in Plum Creek
PCV 8.1.1 Increased Sheriff’s Department Presence.
Increase sheriff’s department presence to deter vandalism
of public property, especially at Texas Road Park.
PCV 8.1.2 Neighborhood Watch. Institute a
Neighborhood Watch program, as a collaboration between
residents and the Sheriff's Office, and to improve
community safety.
PCV 8.1.3 Future Facilities. As Plum Creek continues
to develop, work with citizens and the County’s emergency
services coordinator to develop an emergency services
(fire, rescue, sheriff) substation to serve the Plum Creek
and Bethel/ 177 Corridor.
PCV 8.2 Animal Control. Provide improved animal control
services to address the village's stray cat and dog problem.
PCV 9.0 Recreational Resources
PCV 9.1 Recreational Opportunities. Create and maintain
passive and active recreation areas and opportunities for Plum
Creek residents.
PCV 9.1.1 Hornsby Park. Revitalize, expand and maintain
Hornsby Park as an essential community asset by:
(a) landscaping and planting shade trees
(b) adding picnic tables and barbeque stations
(c) creating fields for team sports for youth; and
(d) expanding the currently playground facilities.
PCV 9.1.2 Texas Road Park. Remove equipment and
facilities at Texas Road Park to address issues of vandalism,
expand parking opportunities, and evaluate the most
appropriate use(s) for that property.
PCV 9.1.3 Vandalism. Reduce or eliminate opportunities
for vandalism in Plum Creek's parks by:
(a) Locating parks and recreation facilities in easily
accessible and visible location;
(b) Locating the active recreation near passive
recreation so it will be used regularly by children
and the rest of the community in an effort to reduce
vandalism;
(c) Encouraging continuous use through recreation
leagues or other regularly scheduled activities;
(d) Providing regular and on-going maintenance-
-repair vandalism and remove graffiti in a timely
manner; closely monitor park use and user
behaviors; and
(e) Designing parks to allow for regular patrol by
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 288
the Montgomery County Sheriff's Office.
PCV 9.1.4 .Linear Park and Trail System. Take
advantage of development constraints imposed by
floodplains to create a linear park, bicycle trail, and/or
greenway system and connect Plum Creek residents to
local facilities and services.
(a) Conduct a study of the feasibility of moving
the commercial district to a non-floodplain area
and converting floodplain properties to part of a
linear park system.
(b) Research grant opportunities for flood mitigation
in Plum Creek.
Develop a system of greenways, trails and sidewalks that
allow Plum Creek residents to walk or bike throughout
the community, (see VITL plan), as well as to other
locations in Montgomery County (Christiansburg) and in
the City of Radford, via the Huckleberry Trail..
PCV 9.2 Neighborhood Park System. Develop a system of
neighborhood pocket parks to provide recreational opportunities
throughout the Village of Plum Creek.
PCV 9.2.1 Safe Playgrounds. Incorporate safe playgrounds
into all neighborhoods that are easily accessible for
residents.
PCV 9.2.2 Active Recreation Areas. Work with developers
to create age appropriate active recreation areas.
PCV 9.2.3 Manufactured Housing Parks. Create and
maintain recreational area requirements for all
manufactured housing parks.
PCV 9.3 Bikeway, Walkway, and Trail System. Create and
maintain a village-wide bikeway, walkway, and trail network that
provides pedestrian access throughout Plum Creek and connects
to the county-wide trail network.
PCV 9.3.1 VITL Plan. Implement the Village
Transportation Links (VITL) plan, which provides trails
for biking and walking that serve to connect points within
the Village of Plum Creek, provide a safe means for
pedestrian and bicycle travel, and would connect to
surrounding localities via the Huckleberry Trail..
PCV 10.0 Transportation Resources
PCV 10.1 Safe Routes Program. Promote safe pedestrian and
automobile travel along Radford Road/ U.S. Rt. 11, Rock Road,
and other roads in the village.
PCV 10.1.1 Transportation Plan. Design a detailed
transportation plan for Plum Creek and seek funding or
streetscape enhancements and traffic calming measures,
such as median planting, streetlights, and landscaping
Coordinate with the County and VDOT to implement
"traffic calming" elements within and around the village,
especially along U.S. Route 1.
PCV 10.1.2 Speed Limit. Work with VDOT to reduce
speeds of U.S. Route 11 (to 35 mph), Rock Road and other
village streets to improve safety.
PCV 10.1.3 Streetscape. Use design elements such as
medians, sidewalks, gateway signs, and streetscaping to
complement the slower speeds and instill the impression
of "place" in Plum Creek.
PCV 10.1.4 Rt. 11/ Rock Road Intersection
Improvement. Create a "T" intersection at U.S. Route 11
and Rock Rd. to eliminate problems with turning
movements and also to reduce opportunities for speeding
PCV 101.5 Road Maintenance. and Improvement.
Repave and upgrade area roads (including ditches for
stormwater) to accommodate new development, improve
safety, and reduce the impact of stormwater.
PCV 10.2. VITL Plan. Implement the Village Transportation
Links (VITL) plan, which provides trails for biking and walking
that serve to connect points within the Village of Plum Creek,
and are a safe means for pedestrian and bicycle travel. These
trails eventually connect to Radford, Blacksburg, and other areas
of Montgomery County.
PCV 10.3 Public Transit and Carpooling. Provide public
transportation and carpooling options as a way to reduce traffic
through Plum Creek on U.S. Route 11.
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 289
PCV 11.0 Utilities and Public Services.
PCV 11.1 Extent Public Water and Sewer Service. The County
will provide and manage public water and sewer service for Plum
Creek. The County will require that new development connect
to these systems and will prohibit new private wells and septic
systems.
PCV 11.2 Limit of Public Water and Sewer Expansion. The
County will limit water and sewer service to the designated
Service Area set forth in this Plan. Providing public utility service
only to the designated area will ensure that new development is
affordable for the County to serve and enhances rather than
degrades the quality of life for local residents.
PCV 11.3 Treatment Capacity. The County will monitor available
treatment capacity. The County will approve rezonings to higher
intensity uses only in conjunction with assurances that adequate
water and wastewater treatment capacity will be available.
Treatment capacity will be expanded in accord with the County's
long-range capital improvement plans. Public utility capacity
will be planned to accommodate the orderly growth in the area,
in accord with the County's overall Comprehensive Plan, rather
than to create or "drive" that growth.
PCV 11.3.1 New Development. The County Public
Service Authority (PSA) will work with the Planning
Commission to develop a policy for allocating sewer and
water capacity in the area in conjunction with rezoning
approvals so as to ensure that treatment capacity is reserved
for such approved development.
PCV 11.4 Capacity for Employment Uses. The County will
reserve a modest amount of capacity (roughly 20% of total
allocated to the planning area) for nonresidential
development/expansion.
PCV 11.5 Public Information. Continue to provide the residents
of the Village of Plum Creek with information concerning water
quality and availability as well as providing other public outreach
mechanisms to address citizen concerns.
PCV 11.6 Underground & Buried Utilities. Require developers
to place utilities underground in all new developments.
PCV 11.6.1 Ordinances. Review all ordinances, and
amend as needed to ensure that all new development is
required to place utilities and wires underground.
PCV 11.6.2 Policies. The County Public Service Authority
(PSA) will work with the Planning Commission to develop
a policy for allocating sewer and water capacity in the
area in conjunction with rezoning approvals so as to ensure
that treatment capacity is reserved for such approved
development.
PCV 11.7 Trash Collection. Institute curbside trash pick-up and
recycling services so that residents do not have to remove their
own trash.
Montgomery County 2025: Plum Creek Village Plan Adopted 11 June 2007 290