Prices Fork Village PlanMontgomery
County,
2025
Adopted:
16 November 2005
Prices Fork
Village Plan
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2005 292
Introduction
The purpose of the village plans is to guide
development in each of the villages, while
maintaining each villages distinct identity. The
village planning process provides citizens in
each of the seven villages (six plans) with a say
in how their respective villages develop over
the next twenty years. This additional input is
important because of the County’s focused
growth approach, which will focus 80% of the
County’s growth between now and 2025 into
the villages, village expansion areas, residential
transition areas, and the urban expansion areas.
Under the guidelines established in
Montgomery County, 2025, villages are defined
as “ larger rural communities where limited
mixed-use development activity has historically
occurred and public utilities are available;...are
separate and distinct from each other and from
nearby towns;... and have served as and will
continue to serve as focal points for surrounding
rural areas.” The village expansion area, on the
other hand, is defined as the areas “adjacent to
existing villages where appropriate new
development can be accommodated while
retaining the viability and character of the historic
village core. It is assumed that the villages and
village expansion areas are either currently
served by public water and sewer and other
public facilities (schools, parks, or fire and rescue
stations) or where public water and sewer is
likely to be provided in the future.
Planning Process and Community Input
Results
The Prices Fork Village Plan was created
through a collaborative planning effort that
involved Prices Fork residents and other
interested citizens, County officials and staff,
students from Virginia Tech, and the consulting
team of Milt Herd and Vlad Gavrilovic. The
roles of the participants were:
• Citizens at large (stakeholders) provided
input and deliberation on the issues and
options for the plan.
• Citizens Advisory Committee served as
a “core” group of citizens to provide
advice and leadership and represented
those citizen stakeholders who were not
actively involved in the process.
• The County staff and the consulting team
provided technical support and
facilitation of the meetings and the overall
process.
• The Virginia Tech planning students
conducted a village-wide citizen survey,
did research on various planning issues
and tools, and assisted in facilitating and
recording the public workshop meetings.
Village Survey and Visual Assessment.
During February, 2005, students from
Virginia Tech conducted a door-to-door survey
in Prices Fork. The students collected 105
responses (23%) from the 464 households they
surveyed. The results of the survey indicated
that Prices Fork residents liked the rural,
agricultural character, the historical resources,
the quiet, neighborly atmosphere, the pleasant
views, and Prices Fork Elementary School.
They also liked the convenience to Blacksburg,
the affordability, and resident commitment to
the village. In their final report, the students
noted that:
• the average length of residency was 16
years,
• 70% of residents owned their own homes,
• 50% of households had children who
were either attending, had attended, or
will attend Prices Fork elementary
• there were multiple generations of
families.
While residents indicated that they liked
Prices Fork “the way it is,” they also recognized
the inevitability of change. When asked what
changes they would like to see in the future,
residents stressed road improvements (especially
Thomas Lane), improved access to facilities
and services (public utilities, trash pickup, and
snow plowing). Other residents expressed the
need for more businesses, construction of
The Village of Prices Fork
Photo by Planning Staff
Photo by Planning Staff
additional single family housing, maintaining
affordability, working with Virginia Tech and
Blacksburg, and pizza delivery.
In addition to the survey, the students did a
house-by-house visual assessment of Prices
Fork. The results of the visual assessment found
that the vast majority of residential properties
in Prices Fork and the Prices Fork Expansion
Area are well cared for. The visual assessment
included both the built structures and the overall
property.
Prices Fork Community Meetings.
During March, April, and May, 2005, The
County conducted three public workshop
meetings. These meetings were well attended
by enthusiastic local citizens who represented
a range of viewpoints about the future of the
village. Through the work of these citizens, a
draft plan was developed that reflected a
consensus of those participants.
The first meeting, held on March 19,
involved “creating the vision.” Participants
reviewed available planning tools and
techniques; identified issues of concern for the
village; and began to define a preferred future
of the area, described in words and graphics.
During the second meeting, “Refine the Future,”
held on April 16th, participants reviewed results
from the first workshop; defined preferences;
and evaluated a draft vision statement, goals,
and alternative draft land use and transportation
concepts. The final meeting, “Affirm the Vision,”
was held on May 7. During the course of the
meeting, participants reviewed the results of
the first two workshops; evaluated and affirmed
the vision statement; and evaluated, refined,
and affirmed the land use and transportation
maps and the policies for all of the plan elements.
Following each meeting, the planning
consultants worked with the materials developed
during the meetings to formulate a vision and
develop a advisory planning document. The
draft plan was submitted to the Planning
Department in June, 2005 for review and
revision.
Results from the three meetings indicated
a keen interest on the part of the residents in
the history and historic preservation of Prices
Fork, of keeping the elementary school in or
near the historic core, and solving the traffic
problems plaguing the village. These interests
are reflected in the draft plan.
The draft plan will be presented to the
Montgomery County Planning Commission
and later to the Board of Supervisors for
consideration and for the required public
hearings. The Planning Commission will hold
its public hearing on the Prices Fork Plan on
site at the Prices Fork Elementary School. If
adopted, the Prices Fork Village Plan will
become part of Montgomery County, 2025, the
County’s comprehensive plan.
Historical Development Patterns
The landforms in the Prices Fork area
comprise a rolling upland plateau that sits
between the drainage areas of Tom’s Creek to
the north and Stroubles Creek to the south. The
western edge of this plateau drains directly into
the New River through a series of steep riverine
palisades. The upland plateau, sided on three
sides by steep slope areas, provided a defined
area of development, just as the ridge between
the two drainage areas provided a logical site
for the old roadway leading west from
Blacksburg Development beyond the plateau
was limited not only by steep slopes, but also
by the presence of significant karst features
(sink holes).
The pattern of roads and settlement in the
Prices Fork area was influenced by the
underlying landforms. The primary east-west
axis of Prices Fork Road straddles the backbone
of the ridge between the Toms and Stroubles
Creek. The generally short roads perpendicular
to the main axis of Prices Fork Road served
farms or isolated clusters of settlement elsewhere
on the plateau. Most significantly, the westward
trend of the main roadway split into the famous
“Fork” directly at a break in the plateau, where
it meets the steeper ravines leading to the New
River. From there, the northern and southern
forks of the road edge the crowns of the slope
that leads down to the river. As is characteristic
in pre-industrial road construction in America,
the roadway alignment took the paths of least
resistance (or lowest cost) and have, as a result,
an organic quality and a direct and intimate
connection to the landscape.
Prices Fork initially developed as a rural,
crossroads trading center at the fork leading to
the New River ferry crossing at Peppers Ferry,
Photo by Planning Staff
Photo by Planning Staff
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 293
Whitethorne, and McCoy. While historical
records indicate that the forks supported at least
one commercial structure and a variety of
residences, little evidence is left of the early
development in the current village.
Prices Fork, as it appears today, developed
in four distinct waves. Between 1850 and 1940,
Prices Fork experienced incremental growth.
Houses were constructed close to the road, at
the front of moderately sized agricultural lands.
Rather than having clearly zoned areas of use,
development along both Prices Fork Road and
McCoy Road (now Tucker Lane) suggested a
compact, mixed use approach to development,
with residential, public, and commercial
structures built next to each other and, at times,
sharing the same lot or same structure.
Following the opening of the Radford Arsenal
(1941) and the expansion of Virginia Tech
(1964), Prices Fork experienced the first two
surges in growth. The growth, however, was
largely due to family subdivision. As jobs in the
area increased, younger generations of families
stayed in Prices Fork rather than leaving to find
work elsewhere. With the exception of the
Hillman subdivision (the first suburban
subdivision in Prices Fork), this pattern of
development remained consistent until the 1980s.
Growth along Old Fort Road and the
development of residential subdivisions like
Montgomery Farms and Phillips Acres signaled
a shift not only in subdivision patterns, but also
in population patterns as well. Unlike earlier
development, the newer subdivisions are
generally disconnected from other earlier
settlement areas. Indeed, as the results of the
Prices Fork survey indicated, residents in the
newer subdivisions were far less likely to
identify themselves as Prices Fork residents
than were those residents who lived in the older
areas of the village.
Current Conditions and Trends
Demographics
According to the U.S. Census Bureau (1),
the population of Prices Fork and the Prices
Fork Expansion area is approximately 1,296.
With 49.7% male and 50.3% female, there is a
greater degree of gender balance in Prices Fork
than in other jurisdictions in Montgomery
County. Although Prices Fork is in close
proximity to Virginia Tech, the gender disparity
at Virginia Tech is not mirrored in Prices Fork,
despite the relatively high number of rental
units (approximately 37.9% of housing units in
the Prices Fork area).
The population under the age of 17 represents
22% of the Price Fork population, with 6%
under the age of 5. While both represent a lower
number than Virginia as a whole, they are both
higher than the rest of Montgomery County.
Given the number of children, it is then not
surprising that the largest age group in Prices
Fork are those between the ages of 24 and 39
(37%). Each successive age group represents a
diminishing percentage of the population: ages
40-49 (15%), 50-64 (12%), and 65 and older
(11%). Residents 18-22 represent the smallest
portion of the population (3%), suggesting, once
again, that despite the percentage of rental units,
Prices Fork does not attract traditional aged
college students.
There are 541 households in Prices Fork,
with an average household size of 2.39. The
largest percentage of households (36%) have
two persons occupying the dwelling, followed
by 25% of households with a single occupant.
The remaining 39% of households have three
occupants or more. Families , with two or more
people related by blood, marriage, or adoption,
represent 66% of the households in Prices Fork.
The average size of family households is 2.86,
while the average size of non-family households
is 1.87.
According to the U.S. Census Bureau, in
2000 there were 565 housing units in Prices
Fork. Of those, 336 (60%) were owner occupied,
205 (36%) were renter-occupied, and the
remaining 24 (4%) were vacant.
Public Facilities.
Currently, only one public facility, Prices
Fork Elementary School, is located in the Village
or Village Expansion Area of Prices Fork. Prices
Fork Elementary provides both the heart of the
community and the civic focal point. Built in
1952, the school is inadequate for the current
student population. The program capacity of
Prices Fork Elementary is 180, although the
school is currently serving 213 students. As
the Village and Village Expansion Areas
develop, this inadequacy will only increase.
Photo by Planning Staff
Photo by Planning Staff
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 294
While the Public Service Authority currently
provides public water and sewer to Prices Fork,
parts of the village are served by neither. The
areas of Prices Fork to the west of Prices Fork
Elementary have public water, but do not have
sewer. Because of this, additional development
north of Prices Fork Road and the area adjacent
to McCoy Road will be limited to a much lower
density than in those areas served or potentially
served by both. The Prices Fork expansion area
(to the east of the historic core and south of
Prices Fork Road) will accommodate far greater
development and greater density because of the
potential availability of both public water and
sewer.
Fire and rescue services are provided by
stations located in Blacksburg and between
Longshop and McCoy, on McCoy Road.
Depending on future development, additional
fire and rescue facilities may be needed in the
future.
Currently, recreational facilities are available
through Prices Fork School and at Blacksburg
Middle School and Kipps Elementary, both
located to the east of Prices Fork along Prices
Fork Road. Parks and Recreation Department
is currently studying recreational needs in the
villages.
Historic Resources.
The eastern portion of the Historic Core,
beginning at the edge of the village and
extending to just past Prices Fork Elementary,
is currently included in the Prices Fork Historic
District, which was placed in the National
Register in 1991. Additional historic resources
are located outside of the boundaries of the
current District. In 1986, when the initial study
for the Historic District was conducted,
structures built after 1936 were excluded. In
addition, structures which were not adjacent to
the proposed district were also excluded,
regardless of age. Because “The Forks” area
of Prices Fork was separated from the eastern
edge of the village by newer structures (built
in the 1940s), many of the historic resources
located in the Village of Prices Fork were left
out of the designated historic district. A re-
evaluation of existing structures will be -
necessary in order to expand the existing district.
Community Facilities and Organizations.
The Prices Fork Grange and the Methodist
Church provide the primary community facilities
in Prices Fork. The Grange, in particular, is
available for community meetings, social events,
and other community activities. The Grange
sponsors the Prices Fork Fair, a community
event that attracts residents and visitors alike.
While a pubic facility, Prices Fork Elementary
also provides community meeting and
recreational facilities. In addition, Snuffy’s, a
small community store, provides a central,
informal meeting place for residents
Planning Assumptions and Land Use
Summary
During the village planning process,
participants relied on five key planning
assumptions:
• Population growth will continue during
the next 25 years, in general accord
with the County’s Comprehensive Plan.
(At slightly more than 1% average
annual growth; up to about 25,000 more
people in the County as a whole by
2030, with 6,000- 8,000 in the
unincorporated areas and the remainder
in the two towns;
• Residential development will be
concentrated mainly in the County’s
designated growth areas, including the
Urban Expansion Areas, the Residential
Transition Areas, and the seven Villages
and six Village Expansion Areas. Prices
fork is one such Village;
• Residential development densities in
the Prices Fork area will occur in
general accord with the County’s
Comprehensive Plan, with 2 units per
gross acre;
• Small amounts of job growth will occur
in the immediate vicinity of Prices fork,
mainly small scale local services and
telecommuting jobs; and
• Public water and sewer service will be
limited to those areas designated in the
County’s Comprehensive Plan.
In addition, there were a number of specific
assumptions made in developing the overallPhoto by Planning Staff
Photo by Planning Staff
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 295
Prices Fork Village Land Use Summary
Overall Assumptions for Total Expansion Area: 875 acres, approx.; Infrastructure Capacity: 1,750 d.u. approx.. (1); Projected Gross Density:
2 du/ac. approx.
Settlement Plan Acreage Existing New Total Average Total
Type Reference Units Units Units Density Commercial
Square Feet
Mixed Use New East
Neighborhood Neighborhood 70 ac.0 350 350 5 du/ac (2)150,000
Residential New Central
Neighborhood Neighborhood 125 ac.0 500 500 4 du/ac 30,000
Village Infill Historic Village
Neighborhood 125 ac.100 50 150 1.2 du/ac 40,000
Rural Rural &
Settlement Infill Areas 555 ac.300 300 600 1 du/ac 10,000
Totals 875 ac.400 1200 1600 2 du/ac 230,000
Notes: 1. Estimated capacity for both existing and new development from the County Comprehensive Plan. 2. Requires density
transfer from surrounding viewshed to achieve 5 du/ac.
General Notes:
1. The above table summarizes estimates for the full buildout of the Prices
Fork Draft Land Use Plan, as affirmed at the Community Meetings in
March to May, 2005.
2. The Full Buildout of this planning area is beyond the 25-year horizon of
the Comprehensive Plan
3. All acreages and unit totals (both existing and new) are approximate and
have not been verified.
Photo by Planning Staff
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 296
Prices Fork Village Land Use Summary
Overall Assumptions for Total Expansion Area: 875 acres, approx.; Infrastructure Capacity: 1,750 d.u. approx.. (1); Projected Gross Density:
2 du/ac. approx.
SettlementPlanAcreageExistingNewTotalAverageTotal
Type Reference UnitsUnitsUnitsDensityCommercial
Square Feet
Mixed Use New East
NeighborhoodNeighborhood70 ac.03503505 du/ac (2)150,000
ResidentialNew Central
NeighborhoodNeighborhood125 ac.05005004 du/ac30,000
Village InfillHistoric Village
Neighborhood125 ac.100501501.2 du/ac40,000
RuralRural &
SettlementInfill Areas555 ac.3003006001 du/ac10,000
Totals875 ac.400120016002 du/ac230,000
Notes: 1. Estimated capacity for both existing and new development from the County Comprehensive Plan. 2. Requires density
transfer from surrounding viewshed to achieve 5 du/ac.
General Notes:
1. The above table summarizes estimates for the full buildout of the Prices
Fork Draft Land Use Plan, as affirmed at the Community Meetings in
March to May, 2005.
2. The Full Buildout of this planning area is beyond the 25-year horizon of
the Comprehensive Plan
3. All acreages and unit totals (both existing and new) are approximate and
have not been verified.
land use categories for the Prices Fork Village
Plan. The consultants assumed that there are
approximately 875 developable acres in the
Prices Fork Village and expansion area; that
infrastructure capacity was 1,750 dwelling units;
and that the projected gross density was two
dwelling units per acre.
Neighborhood Types and Land Uses
Mixed Use Development
Mixed use development has been the rule
rather than the exception in the majority of the
Villages in Montgomery County. Part of this
is due to the nature of small, contained, and
constrained spaces. Unlike their larger
counterparts, which have the luxury of land and
expansive public works and may more clearly
separate uses, villages and village expansion
areas are constrained by limited public facilities,
especially the possible extent and capacity of
public water and sewer. Given the limitations,
all of the land use designations are based on the
assumption of mixed use development.
Mixed use development means that while
certain uses may be deemed most appropriate
for a specific area of the village, the primary
use designation does not preclude other types
of development in, near, or in lieu of the primary
designation. In a sense, this approach means
that portions of the villages and village
expansion areas are treated, in essence, as large
planned unit developments. Indeed, the mixed
use approach to village development encourages
the creation and strengthening of the sense of
community with the village by making goods,
services, and jobs more readily available and
accessible to residents. The approach also
assumes that future development, rather than
destroying or overpowering the historic core,
will be designed to strengthen the historic
development patterns, add to the quality of life
of residents, and provide appropriate levels
and scale of development.
New Mixed Use Neighborhood (New East
Neighborhood)
The new mixed use neighborhood is located
at the eastern edge of the Prices Fork Expansion
Area (adjacent to Merrimac Road).
Neighborhood development in this area should
be pedestrian oriented, with streets laid out
generally in a “grid” pattern, forming blocks
and a connected sidewalk system. Mixed Use
neighborhoods, as the name implies, allows
for a mixture of residential, commercial, and
professional uses. Industrial uses, however,
would not be appropriate for the area. It is
assumed that the area will encourage a variety
of dwelling types, densities, and costs, for all
kinds of people should be included--younger,
older, singles, families, a variety of income
levels, etc. Development in the new mixed use
neighborhood should be compatible with the
historic rural setting. Scale, massing, colors,
and materials of new buildings should be
traditional and compatible with the venacular
architecture and style of the existing historic
neighborhoods and the traditional rural context.
New Residential Neighborhood (New Central
Neighborhood)
The New Residential neighborhood provides a
transition between the higher density
development closer to Blacksburg and the more
traditional lower density development of Prices
Fork. As with the new mixed use neighborhood,
the new residential neigborhood should be
pedestrian friendly, laid out on a “grid” pattern
with an interconnected street and sidewalk
system, provide traditional neighborhood
amenities (tree-lined streets, on-street parking,
and lighting). The neighborhood should allow
for a variety of dwelling types, densities, and
costs. While some commercial or professional
offices would be allowed, the primary emphasis
in the New Central Neighborhood, is residential.
Commercial development would be limited to
a small-scale clustered area along the
neighborhood’s new “Main Street.” The
development of central neighborhoods should
be done in light of connectivity. Any new
development in the new neighborhoods (both
East and Central) should be done in such a way
as to connect them to the larger village rather
than as discrete, isolated units.
Photo by Planning Staff
Photo by Planning Staff
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 297
Village Infill (Historic Village Core, Prices
Fork Historic District, and adjacent
neighborhoods).
The Village Core represents the heart and soul
of Prices Fork. As such, any development or
renovation within established neighborhoods
should be compatible with adjacent structure
and the neighborhood as a whole. The scale,
massing, colors, and materials of new buildings
should be traditional and compatible with the
Villages historic architectural fabric. Given the
rural vistas provide an important historical
context for the Village Core of Prices Fork,
new development should not block scenic views
or vistas, particularly from public roadways.
Careful siting and design of new structures
should be used to maintain open vistas from
adjacent properties.
Rural Infill (Existing Neighborhoods Outside
of the Historic Core and open spaces)
Rural Infill areas include the portion of Prices
Fork accessed from Thomas Lane, between
Brooksfield and Keisters Branch Roads, and
other areas not included in specific neighborhood
areas. Development in the Rural Infill areas
should be located in environmentally suitable
areas and should be designed to preserve
important environmental and cultural resources.
New streets should match the rural character of
existing roads, including streets that are relatively
narrow, which slows traffic. Civic buildings
(such as churches or a new school) should be
on prominent sites with good circulation and
access. Any new development should be
interconnected with the existing village rather
than designed as a discrete and isolated
neighborhood and should be done in such a way
that minimizes disruption of existing landforms
and removal of existing vegetation (specifically
trees or wooded groves). Selected Rural Infill
Areas with both public water and sewer can
achieve higher densities than those areas that
lack either on or both of these utilities or which
have environmental constraints.
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 298
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 299
Prices Fork Critical Features Map
Prices Fork Future Land Use Map
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 300
Prices Fork Illustrative Land Use Map
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 301
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 302
Prices Fork Transportation Map
The following statement of the preferred future of Prices Fork was
created by the citizens at the first meeting, evaluated and refined at the
second meeting, and affirmed by acclamation at the third meeting. This
Vision Statement essentially summarizes the key goals for the future of
the village.
In the Year 2030, Prices Fork:
Remains a Historic, Rural Village with a Strong Community Identity.
Prices Fork is still a place where people know each other and where
generations grow up and stay. It is a place where children are valued
and residents know the local history. It remains a village surrounded by
scenic views of fields, forests and mountains.
The village has accommodated a substantial number of new residents
as well as some new, small scale businesses, but important historic
buildings have been preserved and new development has been integrated
sensitively into the historic fabric, with special attention paid to preserving
the historic relationship of buildings to the street. Citizens and businesses
are active in organizing fairs, festivals, farmers markets and other events
and activities that enhance the sense of community identity.
As one approaches Prices Fork, there is a clear sense of leaving the
Town of Blacksburg and approaching the village, as well as a clear sense
of entering the historic village core. Prices Fork is more than just a
“bedroom” community it has a group of small businesses that provide
some services and employment opportunities for local residents - although
the majority of residents still commute to jobs outside of the village.
Has Good Community Facilities and Services that Support the
Vision. The local elementary school continues to serve as an important
unifying feature of the community. Traffic on Prices Fork Road has
been stabilized through traffic-calming measures, improved connectivity
of streets within the village, the completion of a limited access parkway
to the south of the village and a system of bicycle and pedestrian paths.
A range of park and recreation areas have been created, including small
parks within neighborhoods, and a new community park that serves as
a gathering place to anchor the community, all connected to each other
and to residential areas by safe streets, biking trails and sidewalks.
Public water and sewer service is provided for a defined, compact area
around the village, thereby providing adequate capacity to accommodate
a reasonable amount of future growth, but preventing a scattered, dispersed
pattern that would worsen traffic and undermine the rural character of
the community.
Has a Harmonious Pattern of Compatible Land Uses. The core of
the village has some small-scale stores and service businesses. Overall,
the village has a moderate level of residential density, including a diverse
mixture of housing types and lot sizes, including housing for all age
groups and income levels. Neighborhoods are clearly defined and are
interconnected with each other and with the village core through streets,
sidewalks and trails. New development is sited so as to preserve the
views of open space surrounding the village and rural visual character
of Prices Fork Road. The village is mainly a residential community, with
no heavy industrial uses and only limited commercial uses.
Collaborates with the County, the Town and Virginia Tech in order
to Achieve its Vision. Knowing that the success and well being of the
village depends upon mutual cooperation with neighboring jurisdictions,
the village leaders of Prices Fork have established effective relationships
with Montgomery County, Blacksburg, and Virginia Tech in order to
achieve mutual goals. Each of the parties respects the needs and desires
of the others and continues to work toward common goals and mutually
acceptable solutions to issues that arise. The Town respects the Village’s
desire to control its own destiny and remain an independent community
under the County's jurisdiction. The village continues to plan for the
future, in an open, collaborative and orderly process.
Prices Fork Village Plan: Statement of Preferred Future
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 303
The following policies were developed in meetings with village citizens.
These policies are to guide the actions of the County, State Agencies,
the Town of Blacksburg and private landowners to achieve the preservation
and development of Prices Fork in accord with the Vision of this Plan.
PFV 1.0 Land Use and Urban Design Policies
PFV 1.1 General Policies
PFV 1.1.1 Overall Gross Density for the Village
Planning Area. The overall density of the village planning
area should never exceed two (2) dwellings per gross acre
at full build-out (not expected to occur for at least two or
three decades).
PFV 1.1.2 Compatibility is Fundamental. The density,
type and character of new development must be compatible
with the existing village, the vision of the village’s future,
and be generally consistent with the Land Use Plan Map.
New development must be compatible with the traditional
forms and architectural character of the village.
PFV 1.1.3 Guidelines Are Firm But Flexible. The
policies of this plan are firm guidelines for the County
and for developers. While there is flexibility in how to
achieve these policies, all new development should follow
them in spirit and in action.
PFV 1.1.4 A Variety of Housing Types Should be Built.
The County will encourage a variety of housing types,
costs and net densities, in order to provide high quality
housing for a range of ages and income levels. Most
housing will be single-family detached units, but may
include accessory units, small single-family detached
dwellings, apartments on the second floor levels of
employment or civic buildings, and housing for elderly
citizens.
PFV 1.1.5 Village Gateways. Establish Clear Gateways
at the Major Road Entrances to the Village. Landscaping,
signage, grading and pavement design should be used to
create a sense of transition into the village on Prices Fork
Road from the east and south, and on McCoy Road from
the west. These gateways should be understated, with a
traditional, rural village character, with street design,
landscaping and architecture that will naturally slow traffic
as it approaches the village.
PFV 1.1.6 Proffers Are Expected to Mitigate Impacts.
Any rezoning to a higher intensity of land use, particularly
residential land uses, will be expected to provide proffers
of land, infrastructure and/or funding to off set the impacts
of the development, particularly on capital facilities such
as roads, parks, schools and public safety.
PFV 1.1.7 Incorporate Universal Design Features. A
portion of dwelling units within any given residential
project should feature "universal design" in order to provide
for all age groups and to allow people to "age in place"
within the village.
PFV 1.2 Rural Settlement: Land Use and Urban Design in
Rural Infill Areas
PFV 1.2.1 Residential Density. The net density on a
given tract of land should not exceed an average of 1.0
dwellings per gross acre in the areas designated on the
Land Use Plan Map as Low Density Traditional Rural
Residential Uses.
PFV 1.2.2 Streetscape Features. Streetscape
improvements should include all-weather walking paths,
street trees and parking behind buildings.
PFV 1.2.3 Connectivity. All new streets must connect
into other streets, including the existing street network in
order to maintain and improve the connectivity of the
local street system, for safety and efficiency of travel.
PFV 1.3 Residential & Mixed Use Neighborhoods: Land Use
and Urban Design in New Central Neighborhood and New
East Neighborhood
PFV 1.3.1 Residential Density. The residential density
on a given tract of land should generally not exceed a
maximum of four (4) dwellings per gross acre, with a goal
Prices Fork Village Plan: Policies
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 304
of preserving some useful open space on each site, with
the higher density levels achieved in conjunction with
proffers of conservation easements on significant open
land adjacent to the village.
Net residential density on a portion of a given tract of
land should not exceed five (5) dwellings per net acre in
the areas designated on the Land Use Plan Map as Low
to Medium Density Mixed Residential. The density of
a particular new development site may be somewhat
lower or somewhat higher than this guideline, depending
upon the constraints of the site and how well the developer
meets the policies of this plan and mitigates the impacts
of the development.
PFV 1.3.2 Areas with Higher Net Densities. Areas with
higher net densities should be dispersed throughout the
planning area as shown conceptually on the Land Use
Plan Map. Each such area should be small and compact
so as to form a focal point for a particular neighborhood
or development, and should be designed to reinforce the
traditional, grid street network.
PFV 1.3.3 Streetscape Features on Major Streets.
Streetscape improvements in these areas should include
curb and gutter, sidewalks, on-street parking with curb
bump-outs, pedestrian crosswalks at intersections, parking
behind buildings and in alleys, building heights of two
stories above the front street level, small front building
setbacks, traditional street lights and street furniture,
pocket parks and public greens or squares defined by
adjacent building facades.
PFV 1.3.4 Streetscape Features on Minor Streets.
Streetscape improvements should include walking paths,
street trees and parking behind buildings.
PFV 1.3.5 Street and Walking Connections. New
development should provide street and pedestrian path
connections within the site and to adjacent properties,
including "stub" connections to the property line of sites
that are planned but not yet rezoned or developed.
PFV 1.3.6 New Local Commercial Uses. New
commercial uses in the Prices Fork area should be aimed
primarily at providing goods and services to local residents
PFV 1.3.7 Encourage Mixed-Use Development of a
Neighborhood-Scale. Most new commercial development
in the Prices Fork planning area, as well as the higher
density residential development, should be located along
the Town boundary, south of Prices Fork Road, on
Merrimac Road.
(a) This area should be developed in a traditional
pattern with mixed uses closely knit together, wide
sidewalks and street trees, small building setbacks,
apartments above the stores and parking behind
the buildings. Small-scale apartment buildings of
up to twelve units per building and two stories
above the street, with units not exceeding three
bedrooms each, may be interspersed with the
commercial uses.
PFV 1.4 Land Use and Urban Design in the Historic Village
Neighborhood Area
PFV 1.4.1 Density for the Historic Village
Neighborhood Area. The overall density of new
residential development should generally not exceed on
average, approximately 1.2 dwellings per gross acre in
the designated historic area as shown on the Land Use
Plan Map. (Net densities at the rear portions of tracts
may be higher to balance the lower densities on the front
portions of tracts, in order to preserve the rural, historic
character of the village).
PFV 1.4.2 Maintain the Historic Settlement Pattern
of the Village. This Plan strongly encourages new
development to follow the historic pattern of development
in Prices Fork, including small-scale, compact
development, and maintaining a variety of building
setbacks, entry configurations and parking arrangements.
PFV 1.4.3 Encourage Smaller Lots to Locate at Rear
of Sites. New residential development should locate
larger lots of an acre or more along the frontage of existing
streets, especially Prices Fork Road, with the smaller lots
located behind the larger lots, away from the road, in
order to maintain the historic character of the streetscape.
Any townhouse units in this area should consist of not
more than three or four units in a row and not more than
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 305
two stories above the street.
PFV 1.4.4 Encourage Infill Development. Most of future
growth in the historic neighborhood area should be infill
and redevelopment of existing sites. Ensure that new infill
development is compatible with the existing rural, historic
character of the architectural fabric and siting of structures,
especially along Prices Fork Road. Such development
should be a small-scale mix of shop fronts and civic
buildings interspersed with residential properties.
PFV 1.4.5 Encourage Mixed-Uses. Land uses along
Prices Fork Road in the Historic Neighborhood Area
should be a mix of residential, commercial, office and
institutional uses. Limit new commercial and employment
uses to small-scale, individual or stand-alone buildings
with small building footprints that are architecturally
compatible with the existing commercial and institutional
uses. Auto-oriented and higher volume retail uses should
not locate in this area; those should instead be in the
designated eastern neighborhood.
PFV 1.4.6 Encourage Live/Work Units. Encourage
“live/work” units, which feature a shop or small-scale
office use on the ground floor and a residential dwelling
above or behind the shop, not more than two stories above
the street.
PFV 1.4.7 Minimize the Impacts of Road Improvements.
Evaluate and minimize the impact on historic structures
from any publicly or privately funded road or streetscape
improvements within the planning area.
PFV 1.4.8 Design Details. The County and the Prices
Fork community will strive to maintain the rural, informal
character of the historic village neighborhood area by:
(a) Preserving of the “context” of historic structures,
as well as the structures themselves, including their
natural settings, contributing outbuildings, fences,
hedgerows and other elements of the natural and
historic landscape that enhance and frame the
historic structure.
(b) Locating new or expanded parking areas behind or
to the side of the buildings; screening parking
from adjacent uses with landscape buffers and
using alley access where feasible.
(c) Providing a strong pedestrian orientation along
the street frontage, with parking located mainly at
the rear of the buildings
(d) Prohibiting auto-oriented functions like drive-
through windows
(e) Encouraging new buildings to generally match the
setbacks of adjacent buildings while also
maintaining a variety of setbacks and orientations.
(f) Orient building fronts toward main streets, and
service backs of buildings through alleyways,
wherever feasible
(g) Encouraging porches, street trees, street furniture,
sitting areas and other pedestrian-friendly design
elements.
(h) Establishing an all-weather path system through
the historic neighborhood area, along but not on
- the major streets and connecting commercial and
institutional sites to each other.
(i) Encouraging adaptive reuse of historic structures.
PFV 1.5 Prices Fork Road Corridor
PFV 1.5.1 Preserve Views. Except in the Historic Core,
as development occurs along the corridor, site new
buildings away from the existing roadway so that they
are at a low enough elevation to preserve the views of the
surrounding farms, forests and mountains.
PFV 1.5.2 Avoid Reverse-Frontage Development. New
development adjacent to Prices Fork Road should front
a new parallel street so that the fronts of new buildings
(rather than the rear) face toward Prices Fork Road.
PFV 1.5.3 Manage Access. Develop and implement an
access management plan along Prices Fork Road to limit
the number of access points on the road, consistent with
the land use and design policies for this corridor.
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 306
PFV 1.5.4 Encourage Connectivity. Encourage inter-
parcel connections between all sites along Prices Fork
Road for both vehicles and pedestrians, including making
new connections to existing neighborhoods that need better
and safer access, such as Montgomery Farms.
PFV 1.5.5 Calm the Traffic. Calm traffic that flows into
adjacent residential areas through the use of traffic-calming
devices and street design, and to provide safe pedestrian
crossings.
PFV 1.5.6 Create a Clear, Major Gateway to the Prices
Fork Area. The Town/County boundary at Prices Fork
Road is the key entry point to Prices Fork. The change
in road width from four lanes to two lanes should be
maintained, but the intersection should be redesigned to
improve traffic flow and provide a strong sense of identity
when entering Prices Fork. Landscaping, signage and
pavement configuration should reinforce a transition from
Town to County.
PFV 1.6 Virginia Tech Property
PFV 1.6.1 Preserve the Open Fields Adjacent to Prices
Fork Road. The Virginia Tech property is critical to the
future of Prices Fork. The strong desire of the local
community and the County is that the open, agricultural
fields be preserved.
If, in the future, development occurs on the site, the
fields adjacent to Prices Fork Road should still be
preserved, while more intensive land uses could be
developed in areas away from the road and buffered
from adjacent properties. Such development should
be a mix of uses, including institutional uses such as
research and educational facilities, as well as a variety
of housing types and densities, linked to the
employment uses and to the village core with pathways
and local street connections.
Land Use and Urban Design Action Steps:
• Develop comprehensive corridor design guidelines for new
development and redevelopment in the Prices Fork Road
corridor to ensure compatibility with the existing, historic
design context, including signage, lighting, and streetscape.
• Review and amend the County Zoning and Subdivision
Ordinances and other development standards to ensure that
they do not present barriers to achieving the vision for Prices
Fork and to implementing the policies of this plan.
• Adopt a Traditional Neighborhood Design (TND) ordinance
for the County, including provisions applicable to designated
growth areas such as Prices Fork.
• Identify and eliminate barriers to TND development in the
current zoning and land subdivision and development
ordinances of the County.
• Provide density and other incentives to make TND a preferred
choice of landowners.
• The County will encourage compatible infill development
of vacant sites within the village through zoning or other
regulatory incentives.
• The County will use the Comprehensive Plan to guide
rezoning decisions; it will not rezone to higher density until
feasible and only in accord with adopted plan priorities and
policies.
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 307
PFV 2.0 Government and Planning
PFV 2.1 Collaboration is Key. The County will collaborate
with other government entities to ensure that the policies of this
plan are implemented and the Vision is achieved.
PFV 2.2 Coordinate with Town on Boundary Issues. The
County will work closely with the Town of Blacksburg to maintain
the current Town boundary, coordinate land uses along the edge,
coordinate road linkages and coordinate the provision of public
services and facilities.
PFV 2.3 Work Closely with VDOT to Achieve the People’s
Vision. The County will work closely VDOT to ensure that the
urban design, mobility and public safety policies of this plan are
implemented. Cooperation between the County, VDOT, and
private developers will be critical to the success of this plan.
PFV 2.4 Encourage Coordination Among Property Owners
Associations. The County will foster the creation of Property
Owners Associations as may be needed to provide funding and
management of various public facilities within the planning area
as new development occurs. Such associations should be designed,
managed and coordinated so that the Prices Fork community
remains a unified community and not a disconnected assembly
of separate quasi-governments. Shared ownership, funding and
maintenance of certain facilities may help promote such unification.
PFV 2.5 Encourage a Unified Community. The County will
encourage the people of Prices Fork to act as a single, unified
community when working with the County, Town and State in
implementing this Plan. The citizens committee appointed for
this Plan is one step toward that unified approach. The County
encourages the citizens to take a leadership role in implementing
this Plan once it is adopted.
Government and Planning Action Steps:
• Continue the Prices Fork Citizen Advisory Committee
as an ad-hoc committee to work with the County on
finalizing the Plan.
• Appoint a designated Village representative and alternate
to coordinate with the County during plan refinement,
adoption and implementation.
• Ask that development proposals be initially presented
in the community (e.g. at the Grange or the school),
rather than in (or in addition to) Christiansburg.
• The Town and County will adopt a formal agreement
to maintain the current Town/County boundary adjacent
to Prices Fork.
• Develop a community center for the village, located
within the historic area.
• The County will track total population growth and land
use changes in and around the village to ensure that the
policies of this Plan are being met.
• Village residents, businesses and public officials will
keep our eye on the Vision for 2030 to make the long
term Vision an "embedded" element in the collective
minds of the community.
PFV 3.0 Cultural Resources
PFV 3.1 Encourage Awareness and Knowledge of Local
History. Encourage better understanding and education about
the value of its historic resources and ways that they can be better
preserved.
PFV 3.2 Encourage Historic District Expansion. Encourage
the expansion of the Prices Fork State and National Historic
Districts to include all qualifying sites and structures.
PFV 3.3 Encourage Adaptive Re-Use of Historic Structures.
Encourage the adaptive re-use and rehabilitation of historic
structures throughout the Prices Fork area.
Cultural Resources Action Steps:
• Work with property owners to extend National and State
Historic District to include other historic sites and
structures in and around the historic neighborhood of
the village.
• Establish a series of Historic Interpretive Markers at key
points throughout the village.
• Develop and adopt historic architectural guidelines,
either as policy recommendations to land owners, or as
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 308
part of a County historic overlay district for the designated
historic area.
PFV 4.0 Economic Resources
PFV 4.1 New Local Commercial Uses. New commercial uses
in the Prices Fork area should be aimed primarily at providing
goods and services to local residents.
PFV 4.1.1 Location. Commercial uses should be located
only at the key points in the eastern neighborhood on
Merrimac Road as shown on the Land Use Plan Map (as
well as a small amount of commercial infill development
within the designated historic area). Such uses should be
small scale and compatible with the historic nature of the
village.
PFV 4.1.2 Size. Commercial uses are not planned to be
a major part of the land use mix in Prices Fork. Rather,
a small amount of local retail and personal service
businesses are expected, along with significant numbers
of home occupations. In the eastern neighborhood retail
uses and carefully integrated auto-related uses may be
allowed. In the historic area, only small scale, "mom &
pop" style stores are appropriate.
PFV 4.1.3 Major Commercial and Industrial Uses.
This plan discourages major commercial or industrial uses
such as shopping centers, big-box stores or industrial
parks.
PFV 4.1.4 Employment Centers. The only potential
major employment center called for in this plan is an
agricultural-related research center on the Virginia Tech
property, near the historic area. Any use of this property
should adhere to all applicable policies of this plan.
PFV 4.1.5 Parking. Parking should be located to the side
or to the rear of commercial uses. Access points onto
existing roads should be coordinated with adjacent
properties in order to keep the number to a minimum.
PFV 4.1.6 Signage. Signage should be small scale,
traditional and in keeping with the rural nature of the
village.
PFV 4.1.7 Landscaping. Landscaping should include
street trees and vegetative buffers at the rear of commercial
sites and along any edge contiguous with residential uses.
PFV 5.0 Educational Facilities
5.1 Retain the Elementary School in the Historic Neighborhood
Area. The County will make every effort to keep the existing
elementary school on its current site.
(a) The County will strive to acquire adjacent land as necessary
to upgrade the current facility so it can continue as an
elementary school.
(b) If the County has to acquire a new elementary school site
it will be located within or at the edge of the historic area
of Prices Fork.
(c) If the current site cannot be made suitable for continuing
as an elementary school, the policy of this plan is that it
be converted to a civic use that reinforces the identity and
function of the historic area, such as a community center
and/or museum of local history or compatible private uses
such as a gym, trade school, day care center, or elderly
housing. (Note that elderly housing or an assisted living
facility would be an exception to the general guideline of
one dwelling per acre; however, the school is an existing
structure and further, the impacts of an elderly housing
facility would be generally far less than higher density
conventional housing).
PFV 6.0 Environment Resources
PFV 6.1 Preserve Floodplains. The County will encourage
preservation of the 100-year floodplains in their natural state to
protect against floods and to function as an integral part of the
County's network of open space.
PFV 6.2 Preserve Buffers Adjacent to Floodplains and Karst
Formations. The County will encourage the preservation of a
natural riparian "buffer strip" adjacent to floodplain areas and
setback buffers from Karst sinkholes, in order to protect and
enhance water quality and to maintain wildlife habitat areas
adjacent to stream corridors.
PFV 6.3 Encourage Pervious Paving Materials. The County
will encourage the use of pervious paving materials for parking
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 309
lots and driveways where feasible to maintain groundwater and
surface water quality, and to reduce sheet flows from paved areas.
PFV 6.4 Discourage Development on Steep Slopes. The County
will discourage development on slopes over 15% and encourage
these areas to be maintained as open space to minimize erosion,
downstream flooding and pollution.
PFV 6.5 Manage Development on Moderate Slopes. The
County should ensure that new development on slopes between
10% and 15% incorporates retaining walls, erosion resistant
plantings and careful site planning in order to minimize land
disturbance and erosion potential in these areas.
PFV 6.6 Promote Regional Stormwater Management. The
County will create guidelines and regulations for coordinating
stormwater management facilities on a regional and sub-regional
basis rather than site by site.
PFV 6.7 Solve Existing Drainage Problems. The County will
work with landowners and VDOT to address existing drainage
problems in existing neighborhoods.
Environment Resources Action Steps
• Develop standards for regional and sub-regional stormwater
management facilities the County Engineer will develop
guidelines and regulations for developers to coordinate plans
for stormwater management facilities.
• The County will work closely with local rural landowners to
maintain a green buffer of farmland and open space
surrounding the village, through techniques such as agricultural
zoning, agricultural and forestall districts, agri-tourism and
open space land acquisition. The County will work to develop
incentives for landowners to preserve those areas, including
an economic development strategy for agricultural areas.
PFV 8.0 Public Safety Resources
PFV 8.1 Fire and Rescue Facilities. The existing Blacksburg-
Hethwood station and the existing Longshop & McCoy station
will continue to serve the Prices Fork area. The County should
plan for and reserve a long-term site for a fire and rescue and
sheriff substation, with good access to Prices Fork Road and
Thomas Lane.
PFV 9.0 Recreational Resources
PFV 9.1 Greenway Park and Trail System. Support the
development a county-wide greenway park and trail system master
plan.
PFV 9.2 Pocket and Neighborhood Parks and Green Spaces.
Encourage developers to provide pocket and neighborhood parks
and green spaces in their development designs.
PFV 9.3 Co-Use of School Facilities. Encourage the development
of a joint use agreement between the Montgomery County Public
Schools and the Montgomery County Parks and Recreation
Department for the multi-use of school facilities.
Recreational Resources Action Steps
• Work with Parks and Recreation and the Greenway
Committee to design a master parks plan for the Village of
Prices Fork.
• Design and develop a "Historic Trail" through the village,
linking key sites with a walking/biking trail system.
PFV 10.0 Transportation Resources
PFV 10.1 Recognize that Roadways Are Public Spaces. This
plan recognizes that public roadways are not just conduits for
transporting people and vehicles. Rather, they are public spaces
with important social and cultural functions, including viewing
the community and meeting neighbors.
PFV 10.2 Extend, Connect and Complete the Streets,
Incrementally. Extend existing streets as shown on the Future
Street Network Map;
PFV 10.2.1 Interconnected Grid Network. Interconnect
new streets to form a loose grid network;
PFV 10.2.2 Pedestrian Facilities. Incorporate pedestrian
paths or sidewalks into all new and existing street systems
to protect pedestrians and improve mobility;
PFV 10.2.3 Bike Lanes. Incorporate bike lanes into
collector and arterial roads to protect cyclists and improve
mobility.
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 310
PFV 10.3 Strongly Discourage Cul-de-Sacs. As shown on the
Illustrative Plan Map, cul-de-sacs undermine the desired
connectivity of Prices Fork. In order to achieve safe streets with
a sense of privacy, courts or "eyebrows" can be created rather
than cul-de-sacs.
PFV 10.4 Traffic Calming. “Calm” the Traffic. The use of traffic
calming devices is a priority for the major roadways through the
village, especially on Prices Fork Road within the designated
Historic Area.
PFV 10.5 Make All Travel Modes Safe. Work with VDOT to
ensure that pedestrian and bicycle mobility and safety have equal
priority with motor vehicle mobility and safety on all public
roadways.
PFV 10.6 Manage Access. Limit new access points on the major
through-roads designated in this Plan.
PFV 10.7 Construct Roads in Conjunction with Rezoning
Approvals. Require development applicants to dedicate right-
of-way and build their portion of new roads, in conjunction with
receiving zoning approvals for higher densities.
PFV 10.8 Plan for Long-Term Through-Traffic. Limit the
impact of through traffic by providing new alternative street
connections through the village, as shown and described in this
plan, and by constructing the Southgate Parkway along the
southern edge of the planning area. This new road should be a
controlled access, scenic, high-volume roadway that carries
through traffic around rather than through the village.
PFV 10.9 Pursue Public Transit. The County will pursue
opportunities for public transit, such as a trolley or bus system
service to key points within Prices Fork.
PFV 10.10 Collaborate with Metropolitan Planning
Organization (MPO). The MPO provides an excellent
opportunity for effective regional transportation planning, and
an opportunity for the localities to coordinate their plans for land
use and transportation, including the proposed Southgate Parkway
connector road.
Transportation Resources Action Steps:
• Evaluate the feasibility of bus transit from the Village (and
possibly a location for a commuter parking lot). Prepare
and present a report to the Board of Supervisors.
• Design a Detailed Streetscape Plan for the Prices Fork
Road corridor and seek funding for streetscape enhancements
and traffic calming measures, such as parking islands,
streetlights, landscaping and street furniture.
• Coordinate with the County and VDOT to implement
"traffic calming" elements within and around the village,
especially along Prices Fork Road.
• Complete an alignment study for the Southgate Parkway
and acquire the necessary right-of-way for that road.
• Complete construction of the Southgate Parkway.
PVFP 11.0 Utilities
PVFP 11.1 Extent Public Water and Sewer Service. The County
will provide and manage public water and sewer service for
Prices Fork. The County will require that new development
connect to these systems and will prohibit new private wells and
septic systems.
PFV 11.2 Limit of Public Water and Sewer Expansion. The
County will limit water and sewer service to the designated
Service Area set forth in this Plan. Providing public utility service
only to the designated area will ensure that new development is
compatible with the villages historic character, is affordable for
the County to serve, and enhances rather than degrades the quality
of life for local residents. A potential exception to this policy is
the possibility of extending water service to the Brooksfield Road
and Mt. Zion Road area to serve existing residents.
PFV 11.3 Treatment Capacity. The County will monitor available
treatment capacity. The County will approve rezonings to higher
intensity uses only in conjunction with assurances that adequate
water and wastewater treatment capacity will be available.
Treatment capacity will be expanded in accord with the County's
long-range capital improvement plans. Public utility capacity
will be planned to accommodate the orderly growth in the area,
in accord with the County's overall Comprehensive Plan, rather
than to create or "drive" that growth.
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 311
PFV 11.4 Capacity for Employment Uses. The County will
reserve a modest amount of capacity (roughly 20% of total
allocated to the planning area) for non-residential
development/expansion.
PFV 11.5 Underground & Buried Utilities. Require developers
to place utilities underground in all new developments.
Utilities Action Steps:
• Review all ordinances, and amend as needed to ensure that
all new development is required to place utilities and wires
underground.
• The County Public Service Authority (PSA) will work with
the Planning Commission to develop a policy for allocating
sewer and water capacity in the area in conjunction with
rezoning approvals so as to ensure that treatment capacity
is reserved for such approved development.
• Place overhead wires underground in the historic area.
Montgomery County, 2025: Prices Fork Village Plan Adopted 16 November 2006 312